Moving offices? The IT checklist that keeps you working

Office moves rarely fail because of the furniture. They fail because the internet isn't on, the phones don't ring, or nobody planned the network.

As soon as you sign the lease

  • Order business internet. Installation can take weeks, sometimes longer if construction is needed. This is the item most likely to delay your move.
  • Walk the space with your IT team before the build-out is finalized.
  • Plan cabling for desks, printers, Wi-Fi access points, cameras, door access and phones while walls are still open.
  • Plan the network closet: location, power, ventilation and security.

A month out

  • Confirm the internet install date, and have a backup plan.
  • Decide what equipment moves and what gets replaced.
  • Schedule phone number porting or forwarding.
  • Update your address with vendors, carriers and your domain registrar.

The week of the move

  • Install and test the firewall, switching and Wi-Fi in the new space.
  • Label every computer and its cables before unplugging.
  • Back everything up before anything is moved.
  • Schedule the cutover outside business hours.

Day one

  • Have engineers on site the first morning.
  • Test phones, printers, Wi-Fi and line-of-business apps desk by desk.
  • Keep a list of anything that didn't make the trip.

After

  • Wipe or destroy data on equipment you're retiring.
  • Update your network documentation.